Storage Unit
Ray sells the plan for $1,000 once you own the Storage Unit. Each stage needs the one before it.
| Total cost | Build time | Employees | Loading bays |
|---|---|---|---|
| $12,500 | 8 nights | 3 → 8 | 1 → 2 |
Where it is
Section titled “Where it is”- Yours from the start
- Built by Based
- Loading bay
- Not yours
- Rest of the building
- Built by Based
- Rest of the building
- Opened wall
Before and after
Section titled “Before and after”
BeforeAfterStages
Section titled “Stages”Loft above the unit
Section titled “Loft above the unit”
BeforeAfterOutside
BeforeAfterInside- Cost
- $4,000
- Build time
- 3 nights
- 2 more employees, 5 in total
- Outside steel stair up the west wall
- About 66 m² of new floor
East units
Section titled “East units”
BeforeAfter- Cost
- $4,000
- Build time
- 2 nights
- 2 more employees, 7 in total
- About 54 m² of new floor
South units
Section titled “South units”
BeforeAfter- Cost
- $2,000
- Build time
- 2 nights
- 1 more employee, 8 in total
- About 53 m² of new floor
Second loading bay
Section titled “Second loading bay”
BeforeAfter- Cost
- $1,500
- Build time
- 1 night
- A second delivery spot in the hall
- Bay 1 moves over to make room